| Overview: |
Construction management services
for this 48,000 square foot project which consisted of a new 15,000
square foot, 2-level, facility containing a multi-purpose area
on the lower level and a gymnasium on the upper level. A new
10,000 square foot, 3-level, link was built to connect the
church and the school. A new 17,000 square foot, 2nd level
addition was built above the existing school, followed by 6,000 square feet of renovations to the lower level. The newly renovated
facility now houses 370 students. All work was accomplished
while the church and school remained occupied and fully operational.
|